Project Management

2014-11-07 00:10:04
* Mould Base: LKM mould base with steel 1.1730 will be used unless customer has other requirements. 
* Mould Component: HASCO or DME equivalent component
* Hot Runner system: YUDO, HUSKY, MOULDMASTER, etc.
It need to take 3~5 days to finish the2D design of one mould. The standard procedure is as below, and the specific time for each mould design depends on the complexity of the part structure and how fast we can get feedback from customer.

 

Besides advanced equipments, good mould design and skilled technicians, a project need excellent project management to make every factor to play a good role.

 

A project engineer will be appointed to follow up the whole process from mould design to the final delivery. Weekly tracking report with manufacturing photos will be offered to customer, so that they can check the actual condition of the tooling without coming to China, and also get reference if they want to change part design and stop manufacturing.